Bank 1 dip switch 1 is set to gas.
I will toggle the switch. Do I need to turn power off to the board for all dip switch changes and timer/temp changes such as the staging timer/oas?
Thanks.
Search found 2 matches
- Tue Aug 19, 2014 11:47 am
- Forum: Help and Advice
- Topic: Rev O Valve Light
- Replies: 3
- Views: 13902
- Sat Aug 16, 2014 8:05 am
- Forum: Help and Advice
- Topic: Rev O Valve Light
- Replies: 3
- Views: 13902
Rev O Valve Light
Hi,
I have a UZC 4 hooked up to a 1 Stage Heat 2 Stage Cool Electric Conventional Air Conditioner.
Currently I have one zone stat wired up and the HVAC equipment wired. Everything works as expected. My question is that I have the REV O Valve light lit up on the panel. I don't have a heat pump so I ...
I have a UZC 4 hooked up to a 1 Stage Heat 2 Stage Cool Electric Conventional Air Conditioner.
Currently I have one zone stat wired up and the HVAC equipment wired. Everything works as expected. My question is that I have the REV O Valve light lit up on the panel. I don't have a heat pump so I ...